PRISM

Project Records and Intelligent System Management

One project. Every division, clearly.

Workpacks, joints, certs, test packs, specs and handover in one connected record, from the first workpack to handover to operations. PRISM spots the gaps before they hold up a handover.

Sign inSee what it covers

Multi-project · multi-operator · works on site tablets

What it covers

Each division gets its own view of the same records

Workpacks & engineeringGuided pack builder, norms and hours, method statements, permit-ready steps, checked and signed A1 → C1.
CompletionsTag register, joint integrity, ITRs, leak test packs and punch, signed in the field.
LibrarySpecs, procedures and standards per asset, with revisions, and joints checked against them.
CommissioningProcedures and readiness per system, from mechanical completion to start-up.
HandoverSystem handover, with any exceptions signed twice and tracked until they close.
✦ Ask PRISMAsk in plain English, e.g. “what's stopping this system handing over?”, with the source quoted.
How it links

Enter it once. Every division sees the same record.

Workpack→Tag→Joint · pipe class→Joint certs→Leak test pack→System→Handover
PRISM spottedGaps, risks and quick wins found across the records. An engineer fixes each one or verifies it's OK, and it's time-stamped.! 3 joints on a workpack have a stud material the current pipe class no longer allows.! System 20-01 is two ITRs from mechanical completion.
Checked and signedJoint data verified by completions before a pack is issued. Specs kept per asset with their revisions. Every signature carries a name, a role and a time. Each operator's data is kept separate.